Subseacable Installation (2012)
Operation Detail

Subseacable Installation (2012)

AW-Energy · Almagreira - Portugal · 2012
engineering_support

Operational context

Installation of a subsea communication cable from beach to nearshore, supporting WaveRoller system integration in Peniche.

Divexpro supported the installation of a subsea communication cable connecting the shoreline to a nearshore WaveRoller unit in Peniche, Portugal.

The operation involved coordinated beach and marine activities, including cable handling, positioning and controlled deployment from land into the water.

Execution required precise timing with sea and tidal conditions, as well as coordination between shore-based teams and marine support units to ensure safe and effective installation.

This work demonstrates Divexpro’s capability in subsea infrastructure support, combining practical field execution with engineering coordination in a nearshore environment.

Capabilities involved

  • Subsea cable installation
  • Beach to nearshore operations
  • Cable deployment and handling
  • Engineering support
  • Marine-land coordination
  • Nearshore execution
  • Operational coordination

Field images

Subseacable Installation (2012) image 1
Subseacable Installation (2012) image 2
Subseacable Installation (2012) image 3
Subseacable Installation (2012) image 4
Subseacable Installation (2012) image 5
Subseacable Installation (2012) image 6
Operations
Marine operations backed by real field experience
Divexpro works across technical maritime operations, diving, vessel support and engineering execution.
Scroll to Top