Waveroller Deployment (2008)
Operation Detail

Waveroller Deployment (2008)

AW-Energy · Peniche - Portugal · 2008
wave_energy

Operational context

Deployment of a second WaveRoller unit in Peniche, including lifting operations, towing and nearshore installation support.

Divexpro supported the deployment of a second WaveRoller unit in Peniche, Portugal, as part of the early-stage development of wave energy systems.

The operation involved heavy lifting using crane equipment, controlled loading procedures and marine logistics to safely transfer the unit from land to water.

Following deployment, the unit was towed to the installation area using inflatable support vessels, requiring precise coordination and real-time adaptation to sea conditions.

The work combined lifting operations, vessel handling and nearshore marine execution, contributing to the practical implementation of wave energy technology in Portugal.

Capabilities involved

  • Wave energy deployment
  • Heavy lifting operations (crane)
  • Marine logistics
  • Tow operations
  • Inflatable vessel support
  • Nearshore installation support
  • Operational coordination

Field images

Waveroller Deployment (2008) image 1
Waveroller Deployment (2008) image 2
Waveroller Deployment (2008) image 3
Waveroller Deployment (2008) image 4
Waveroller Deployment (2008) image 5
Operations
Marine operations backed by real field experience
Divexpro works across technical maritime operations, diving, vessel support and engineering execution.
Scroll to Top